Steel
Steel Z-Profile
Cold-formed galvanized and black steel Z-purlins and structural framing sections for pre-engineered buildings and industrial roofs.
| Price band | Contact for latest FOB guidance |
|---|---|
| Minimum order | By project / length schedule |
| Lead time | 15-25 days by production schedule |
| Product Type | Cold-formed Z-profile structural purlins and girts |
| Steel Substrate | Hot-dip galvanized steel (Z120-Z275 coating) or black steel |
| Yield Strength | S250GD, S320GD, S350GD structural grades |
| Profile Heights & Flanges | Z140 to Z300; thicknesses 1.5mm to 3.0mm; custom hole punching per schedule |
| Packaging | Nested strapped bundles with lifting slings for container or truck transport |
| Shipping & Logistics | FOB Bandar Abbas / overland transit; 20ft/40ft containers |
| Origin | Iran |
Export Logistics & Procurement Terms
Supplier & Origin: Request the proposed producer, origin evidence, and available quality documents with your RFQ. Supplier identity and inspection arrangements are confirmed for each quotation.
Minimum Order Quantity (MOQ): State your required quantity and shipment unit. The producer's minimum and any consolidation option must be confirmed with the quotation.
Packaging & Cargo Protection: Specify the packing and handling requirements for your destination. Confirm crate or bundle design, weights, and loading plan with the supplier before ordering.
Shipping Routes & Exit Ports: Include your destination and requested Incoterm. The feasible origin port, route, and freight terms are confirmed in the current offer.
Lead Time & Dispatch: Ask for a dated production, packing, and dispatch schedule. Timing depends on the confirmed producer and order specification.
B2B Quotation Workflow: All industrial procurement is quoted offline based on specific dimension schedules, custom processing, and current ocean freight rates. Add items to your RFQ drawer or submit technical drawings for an itemized Proforma Invoice (PI).
